Crude Oil Riser of a leading Malaysian oil company


 

CRUDE Oil risers on board Semarang Platform had a leak on the risers & were temporarily sealed with clamp and Class G cement. The area of the riser from the splash zone to app 5 meters above were severely corroded due to the constant exposure to the moist Salt laden atmosphere

 

 

Apply a coat of Corro-Dur 561 to even the surface and to distribute the load

Wrap with Corro-Wrap A water activated wrapping composite system to the no of required wraps to withstand 800 psi operating pressure

 

 

 

Finished with 1 coat of Corro-Dur 258

The above exercise was completed in 12 hours and allowed to cure for another 8 hours before being put back into operation